Skip to content

  • 07916 403141

Back to News

A14/A1 PROJECT

Date: Mon 23rd April 2018

Surface water channel outlets gullies on the A14/A1 expansion project.

These include setting on V shaped gratings before shuttering. Concrete is then poured into the shutters and the V shape formed and finished by hand. Inside the V gratings the concrete is formed into a dish, allowing surface water to flow into the lid and be directed into the outlet pipe below. 

   

 


Back to News


Roadhouse Building & Civil Engineering Ltd
The Shingles, Spa Esplanade, Herne Bay, Kent, CT6 8EP
Company Registration Number:7702247
Web Design By:
Smart Domain Group
Top