NEW JOB DUE TO START ON THE A14!
Date: Tue 17th October 2017We have just been awarded a new job on the A14 due to start on the 23/10/17!
On this project we will be constructing sections of v channel for road drainage, these include setting on iron works over drains with a v profile to a set height and line. In situ shuttering is then placed around these to form the side of the channel and a screed is cut to shape using ply wood and pulled along the length to form v to a set depth, this is then finished with a steel float for a smooth finish.
Some of these require outlet to be curved away from the main channel and into a ditch for drain off, which will be shuttered with a 2.4m radius.
Back to News