RECENT WORKS ON ABERDEEN
Date: Mon 12th February 2018Below we set up a timber edging and poured concrete inside to form a base for a wall bifurcation. Shutters will be set up on top of base.
Below
Shutters to bifurcation have been set up and concrete is being poured into the shutter. This will be steel float finished, covered with frost blanket to aid curing and left for 16 hours to cure before it is struck.
Below
This is a maintenance crossing transition slab, with a 9 meter long recess for an embedded pre cast unit to sit in. This is for a transition from a paved barrier to precast units for a crossing point in the central reserve.
Below
Here we set up steel with a tensioning bar to tighten a steel strand that runs through the paved barrier to precast Delta Block units. This is a transition from paved concrete barrier to precast Delta Block. Extra strength concrete is then poured in the shutters to form the barrier.