A14
Date: Tue 31st October 2017This is a section of surface water channel on the verge of the A14, two lids have been set to channel level for drainage and in situ shuttering erected ready for concrete to be poured into.
Back to News
This is a section of surface water channel on the verge of the A14, two lids have been set to channel level for drainage and in situ shuttering erected ready for concrete to be poured into.