A14 PROJECT
Date: Wed 28th March 2018Here on the A14 project we are constructing curved outfall to the surface water channel which drains off into a ditch in the verge. These include making shutters to a required radius. Once these are poured, an infill is then poured in the remaining gap between the fish tail and outfall.
Back to News