NEW PROJECT M4
Date: Wed 7th November 2018We have just been awarded a new project on the M4.
We will be installing DCB bifurcations where the DCB meets bridge piers. Shutters will be constructed to meet the size of the bridge pier. We will be installing slot drain outlets and rodding end with a pre-fabricated aluminium box, which is shuttered encased in concrete.
Also we will be constructing surface water channel in a V shape and installing V shaped gratings.
Back to News